Trace a specification change to everyone it touches.

One change to a specification reaches the factory, the mill, costing, the lab, the studio and the catalog, and you see who has acknowledged it.

Fabric decision · CAT-042Week 6

Stay on 12 oz canvas, and tell everyone who planned for 10 oz.

Why
The 10 oz canvas failed its wash test
Changed
Revision C withdrawn. Revision D stands
Cost
+$2.80 a jacket against Q07
Touches
Factory, mill, costing, wash lab, studio, catalog
Open
The retailer spec sheet

The impact brief. Development reads it once, then releases the decision.

Sound familiar?

  • Sourcing, costing, the studio and the catalog hear about a change at different times.
  • The factory quotes on a revision you stopped using weeks ago.
  • Nobody can say who has seen the new spec and who hasn’t.

A change that reaches only some of the people who plan around it leaves two versions of the product in the building, and someone builds the wrong one.

Fernway’s canvas jacket, one fabric decision

  1. Eighteen records named the fabric.

    Quotes, samples, cost sheets, test bookings, shot lists and catalog copy, found by revision rather than by search.

  2. All eighteen were told, where they work.

    The mill, the factory, costing, the lab, the studio and the catalog each got the change in their own channel.

  3. Sixteen acknowledged.

    Each owner confirms, and silence is chased. Nothing counts as seen because it was sent.

  4. Fifteen records updated.

    Quotes, cost sheets and bookings moved to the new revision. The old sample was withdrawn.

  5. The cheaper quote was for a different jacket.

    Q07 cited revision C and a 10 oz canvas that failed its wash test. Quote Q06, on revision D, stands.

Record
18Affected records18Notified16Acknowledged15Updated
Where it landed
FQFactory · Q06
Reached updated
Quote Q06 stands, on revision D
CMCanvas mill
Reached acknowledged
Acknowledged
COCosting
Reached updated
+$2.80 a jacket, approved
WLWash lab
Reached acknowledged
Retest booked
STStudio
Reached updated
No reshoot needed
CACatalog
Reached updated
‘Machine washable’ kept
RSRetailer spec sheet
Reached notified
Waiting on the retailer
RCRevision C sample
Reached affected records
Withdrawn
Quotes · Canvas field jacketWeek 4
QuoteBuilt toCanvasReal cost
Q06 · $31.20 a unitRevision D12 oz, wash tested$31.60
Q07 · $28.40 a unitRevision C10 oz, never washed$35.10

Real cost adds the wash test and rework, and the returns a quote is expected to cause

How quote comparison works

What changes.

Show
Who’s affected
Remembered by whoever made the changeFound by revision across quotes, samples, tests and records
Telling them
An email and a meetingEach owner told in their own channel
Acknowledgment
Silence counts as yesEach owner confirms, and silence is chased
Cost
Found on the invoiceWorked out per unit before anyone commits
The old version
Left in circulationWithdrawn, so nothing is built from it

How it works. 7 steps, 5 stages.

  • AI2
  • Rules and automation3
  • Your team2
  • Approval
  1. 1Spot

    1. AI

      Spot what changed

      Reads two revisions and flags changes in meaning, like a heavier canvas, as well as changed numbers.

      • FlexPLM
      • Centric PLM
      • Arena
  2. 2Trace

    1. Rules and automation

      Find every record it touches

      Quotes, samples, tests, cost sheets, shot lists and catalog records matched by revision.

    2. AI

      Draft the impact brief

      Affected suppliers, costs, tests and deadlines on one page, with the sources linked.

  3. 3Release

    1. Your teamApproval

      Release the change

      Development approves the decision and any cost change before anyone is told.

  4. 4Notify

    1. Rules and automation

      Notify each owner where they work

      The mill, factory, costing, lab, studio and catalog each hear in their own channel.

      • Outlook
      • Shopify
  5. 5Confirm

    1. Rules and automation

      Track acknowledgment, withdraw the old

      Silence is chased, and superseded samples and quotes are withdrawn.

    2. Your team

      Close the gaps

      Your team follows up what the system can’t, like a retailer’s spec sheet.

Every change leaves a record the next one starts from

What you get. Real work, every week.

Acknowledgments · 18 recordsWeek 6
RecordOwnerStatus
Quote Q06FactoryStands, on D
Mill spec, revision 2Canvas millAcknowledged
Cost sheetCostingApproved
Retailer spec sheetRetailerWaiting
Revision C sampleDevelopmentWithdrawn

Who has acknowledged, by record. Anything still waiting is chased, and shown.

Records updatedSynced
  • Cost sheet$28.40$31.20Week 6
  • Factory order draftRevision CRevision DWeek 6
  • Wash lab booking10 oz swatch12 oz swatchWeek 6
  • Catalog fabric10 oz canvas12 oz canvasWeek 6

The records that moved to the new revision, as they changed.

How you’ll know it’s working.

  1. Time to a confirmed response from each owner

    A change isn’t done when it’s sent. It’s done when each owner says they have it.

  2. Records still on a superseded revision

    Every one is a place where the old product can still get built.

  3. Re-quotes caused by a change

    Shows whether suppliers are working from the revision you meant.

Baselines agreed before we build.

Works with what you have.

PLM & specs

  • FlexPLM
  • Centric PLM
  • Arena
  • Specright

ERP, CRM & inbox

  • Outlook

Commerce

  • Shopify
  • NetSuite
We configure first
Your PLM already runs change requests. We use its change and release flow, and add what it doesn’t do: reaching suppliers, costing, the studio and the catalog by revision.
We build when
A change has to reach people who don’t work in your PLM, and you need proof they’ve seen it.

What a first build includes.

Built in your accounts, around your team. Scope, fee and baseline agreed before we start.

  1. 1Design
  2. 2Build
  3. 3Run it, or hand it over

We build

  • A change-impact map keyed by revision
  • Impact briefs with costs, tests and deadlines
  • Notification and acknowledgment tracking for each owner
  • Withdrawal of superseded revisions

We start from

  • Revision history and approvals
  • Supplier and mill contacts
  • Cost sheets, test bookings and catalog records

From your team

Owner
Product development lead
Involves
  • Development
  • Sourcing
  • Costing
  • Quality
  • Studio
  • Catalog

Questions teams ask.

Do suppliers have to use a portal?

No. They can answer from email or the portal they use today. A forced portal can add work for the supplier, so we meet them where they already answer.

What if a document doesn’t name its revision?

It’s held as unresolved and shown to its owner. We never guess which revision a document means.

Can it release a change on its own?

No. A person with authority releases every change, and nothing a model writes can overwrite a released record.

Who owns it once it’s running?

You do. It’s built in your accounts, documented, with training for the people who run it. Ownership usually sits with your product development lead. We can keep running it with you, or step back.

How do we start?

Usually with a development review: two to four weeks, a fixed fee credited to the build, and a plan that’s yours. If the job is already clear, we can scope the build directly.

Let every change reach everyone it touches. Start with a development review.

We reply within one business day.