Hand off a complete production package.

A complete, versioned package that the factory confirms it has, before the first run starts.

Handoff package · CAT-042

10of 12 items ready for the factory

  • Tech pack, revision E
  • Approved sample S03
  • Quote Q06 confirmed on revision E
  • Wash report, 12 oz canvasWash lab, due this week
  • Import certificate evidenceLinked once the report is in

The package, with what’s still open. Nothing is released while items are open.

Sound familiar?

  • Production started with a missing approval, and nobody noticed until the run.
  • The factory has three versions of the pack and asks which one is right.
  • The test report exists, somewhere.

A gap found after the cut is a gap you pay for in fabric, freight or a late start.

What changes.

Show
The package
Files sent as they’re foundOne versioned package, built from the approved records
Gaps
Found at the first runListed before the handoff, each with an owner
Confirmation
The factory says “got it”The receiving owner confirms the current version
Evidence
Test reports in someone’s inboxReports attached to the revision they cover

How it works. 5 steps, 4 stages.

  • AI1
  • Rules and automation2
  • Your team2
  • Approval
  1. 1Assemble

    1. Rules and automation

      Build the package from approved records

      Tech pack, sample approval, tests, quotes and certificates pulled by revision.

      • FlexPLM
      • Centric PLM
      • Techpacker
      • Specright
  2. 2Check

    1. AI

      Find what’s missing or conflicting

      Reads the package against your checklist, and flags a test that doesn’t match the revision.

  3. 3Close

    1. Your team

      Close the gaps

      Owners attach the report, approve the sample or decide the open condition.

  4. 4Confirm

    1. Your teamApproval

      Sign off the package

      The development lead signs. The factory confirms it has the current version.

    2. Rules and automation

      Pass approved facts on

      Release facts go to purchasing and the catalog once the package is signed.

      • NetSuite
      • Shopify

Every late find adds a line to the checklist

What you get. Real work, every week.

Confirmations · revision E
  • Factory production plannerPackage for revision E, version 3ConfirmedCurrent
  • PurchasingCanvas and thread orders match revision EMatchedCurrent
  • CatalogRelease facts: 12 oz canvas, machine washable on coldWaitingOpen

Who has confirmed the current package. The first run waits for every confirmation.

How you’ll know it’s working.

  1. Handoffs complete on first send

    A late find at the factory is a gap the package should have shown.

  2. Missing-approval defects after production starts

    The cost of a gap that got through.

  3. Hours spent assembling the package

    Capacity that should go to decisions.

Baselines agreed before we build.

Works with what you have.

PLM & specs

  • FlexPLM
  • Centric PLM
  • Arena
  • Techpacker
  • Specright

Commerce

  • NetSuite
We configure first
Your PLM or tech-pack tool already builds a pack. We start from its export and add the checks and the confirmation.
We build when
The package is assembled by hand from files in several places, and gaps show up at the first run.

What a first build includes.

Built in your accounts, around your team. Scope, fee and baseline agreed before we start.

  1. 1Design
  2. 2Build
  3. 3Run it, or hand it over

We build

  • A package template with required items per product type
  • Checks that every item matches the revision
  • An outstanding-conditions list with owners
  • A confirmation step for the factory and purchasing

We start from

  • Tech packs and approvals
  • Test reports and certificates
  • Your checklist, or the one the factory uses

From your team

Owner
Product development lead
Involves
  • Development
  • Quality
  • Sourcing
  • Factory partner
  • Catalog

Questions teams ask.

Where does certificate evidence fit?

The package links test reports and certificates to the product and revision, so the importer or broker can find them. CPSC certificate eFiling for covered imports took effect on July 8, 2026. Whether a product is covered, and what its certificate says, stays with your compliance owner and broker.

Does a complete package mean the product is approved?

No. It means nothing known is missing and the right people have confirmed they have it. Your development lead signs the package, and the system never decides that a test passed.

Who owns it once it’s running?

You do. It’s built in your accounts, documented, with training for the people who run it. Ownership usually sits with your product development lead. We can keep running it with you, or step back.

How do we start?

Usually with a development review: two to four weeks, a fixed fee credited to the build, and a plan that’s yours. If the job is already clear, we can scope the build directly.

Start production on the right version. Start with a development review.

We reply within one business day.