Qualify a substitute when a material runs short.

When a material runs short, the substitute is compared on total cost and tested before it ships, with the decision kept against the revision.

Thread substitutes · CAT-042
CandidateCost a jacketTests before it shipsDecision
Thread A · approved, short$0.40Already passedUnavailable
Thread B · same fiber, new mill+$0.10Wash, shrink, seam strengthTest first
Thread C · polyester core+$0.25Wash, shrink, seam strengthTest first
The factory’s stock thread—No test on fileRefuse

Candidates for one material, compared on what each costs and what it must pass.

Sound familiar?

  • The mill is out of the canvas and the factory suggests “something similar”.
  • A substitute gets swapped in on a line and nobody files it.
  • Nobody can say what a cheaper material really costs once tests and returns are counted.

A substitute nobody qualified is a change nobody approved. It can surface months later, as returns from one lot.

What changes.

Show
Candidates
Whatever the factory suggestsAlternatives drawn from your approved materials and past tests
Cost
Price per meterTotal cost: price, tests, rework and expected returns
Testing
A swatch and a hopeA test plan sized to the risk, run by qualified people
Approval
A phone callA decision on record, against the revision

How it works. 6 steps, 4 stages.

  • AI1
  • Rules and automation3
  • Your team2
  • Approval
  1. 1Trigger

    1. Rules and automation

      Catch the shortage

      A mill delay, price rise or lot change flagged against every style that uses the material.

      • NetSuite
  2. 2Compare

    1. AI

      Find qualified alternatives

      Approved materials, past test results and supplier alternatives compared with the spec.

    2. Rules and automation

      Total the cost

      Price, tests, rework and expected returns for each candidate.

  3. 3Test

    1. Your teamApproval

      Choose the tests

      Quality and development decide what each candidate must pass before it ships.

  4. 4Decide

    1. Your teamApproval

      Approve or refuse

      The decision is recorded against the revision, with its conditions and the supplier.

    2. Rules and automation

      Tell everyone it touches

      An approved substitute goes out through the change process.

Approved substitutes join the material library

What you get. Real work, every week.

Decision · thread BConditions

Use thread B once the wash, shrink and seam tests pass.

Why
Thread A is short for the next lot
Tests
Wash, shrink and seam strength, run by the lab
Condition
The approved lot only, with the supplier acknowledging
Recorded
Against revision E and the factory order

The decision, with its conditions, kept against the revision and the supplier.

How you’ll know it’s working.

  1. Days from shortage to a qualified alternative

    How long a production plan waits on a material.

  2. Total cost per unit against the original

    The comparison that includes tests, rework and returns as well as the price.

  3. Substitutes shipped without a test on file

    The number that should be zero.

Baselines agreed before we build.

Works with what you have.

Commerce

  • NetSuite

PLM & specs

  • FlexPLM
  • Centric PLM
  • Specright
  • Techpacker
We configure first
Your PLM or spec platform already holds approved materials. We start there and add the shortage trigger and the test plan.
We build when
A shortage reaches you by phone or email, and the alternatives aren’t on one record.

What a first build includes.

Built in your accounts, around your team. Scope, fee and baseline agreed before we start.

  1. 1Design
  2. 2Build
  3. 3Run it, or hand it over

We build

  • A material trigger tied to every style that uses it
  • A candidate comparison on total cost and tests
  • Test plans for qualified people to approve
  • A decision record tied to the revision and supplier

We start from

  • Approved materials and past test reports
  • Supplier alternatives and price lists
  • Returns by material or lot

From your team

Owner
Head of development or quality lead
Involves
  • Development
  • Quality
  • Sourcing
  • Factory partner

Questions teams ask.

Does AI choose the substitute?

It finds and compares candidates. Quality and development choose the tests and approve the substitute, and the record shows who did.

Do you handle formulations or engineered parts?

Not on our own. Scientific formulation and engineered-product CAD are specialist work, so we’d work with a specialist partner and keep the evidence and the decision on your product record.

Who owns it once it’s running?

You do. It’s built in your accounts, documented, with training for the people who run it. Ownership usually sits with your head of development or quality lead. We can keep running it with you, or step back.

How do we start?

Usually with a development review: two to four weeks, a fixed fee credited to the build, and a plan that’s yours. If the job is already clear, we can scope the build directly.

Qualify the substitute before it ships. Start with a development review.

We reply within one business day.